Wind–PV hybridisation

Test wind resource, turbine layout, wake effects and shared connection use around PV.

Build the technical case

  • Choose an evidenced turbine and power curve.
  • Set hub height, rotor, setbacks and land availability.
  • Review wind resource, wake losses and seasonal complementarity.
  • Test the shared export limit and curtailment priority.
  • Use reference CAPEX in EUR or USD before converting to the project currency.

Use the outputs

The layout, energy balance, constraint schedule, assumptions and electrical concept can seed a wind feasibility brief and engineering handoff package.