Wind–PV hybridisation
Test wind resource, turbine layout, wake effects and shared connection use around PV.
Build the technical case
- Choose an evidenced turbine and power curve.
- Set hub height, rotor, setbacks and land availability.
- Review wind resource, wake losses and seasonal complementarity.
- Test the shared export limit and curtailment priority.
- Use reference CAPEX in EUR or USD before converting to the project currency.
Use the outputs
The layout, energy balance, constraint schedule, assumptions and electrical concept can seed a wind feasibility brief and engineering handoff package.