PV8 engines
Data centre co-location
Test IT capacity, power, fibre, cooling, footprint, heat and commercial structure.
Screen the infrastructure
- Available import, export and firm-power concept.
- Three to five fibre or interconnection candidates rather than nearest-only distance.
- Facility footprint, access, cooling conditions and planning envelope.
- PV supply, grid supply, BESS and backup topology.
- IT load, utilisation, PUE and ownership or lease structure.
Read connectivity evidence honestly
Published PoPs, backbone routes, carrier-neutral facilities and estimated access routes are separate layers. Two nearby PoPs are not labelled diverse unless separate physical paths and entrances are carrier-confirmed.