How the screening SLD is built

PV8 generates an SLD from an engineering topology contract, not from catalogue rows alone. The contract identifies sources, converters, transformers, switchgear, meters, protection boundaries, connection point and operating direction.

  • Equipment ratings and voltage levels remain explicit.
  • Unknown protection and fault-duty values remain open items.
  • Existing, retained, removed and proposed equipment are visually distinct.
  • Engine-specific loads and generators use the same shared topology model.

Did this answer your question?

Your response helps PV8 improve the next guide.

Still need a hand?

Bring the decision, not a support ticket.

Tell PV8 what you are trying to decide and which asset or result is involved.
Contact PV8 →