Skip to the guides
PV8Knowledge base

PV8 GUIDES

How can we help?

Find the workflow, evidence and engineering guidance for turning an existing PV site into a better decision.

/

Create a reliable Asset Profile

Build the common plant record every engine can reuse.

Record the durable facts

  • Plant identity, coordinates and country.
  • Parcel and PV boundaries with their coordinate reference system.
  • Installed DC and AC capacity, commissioning and equipment.
  • Connection voltage, export and import rights where evidenced.
  • Generation history, curtailment and operational constraints.
  • Ownership, support scheme and decision context.

Attach evidence

Upload source documents and link each confirmed fact to the document, page, date and evidence grade. Publicly discovered values remain visibly separate from owner-confirmed values.

Did this answer your question?

Your response helps PV8 improve the next guide.

Still need a hand?

Bring the decision, not a support ticket.

Tell PV8 what you are trying to decide and which asset or result is involved.
Contact PV8 →