PV8

Greece Data centres

Will your data centre meet the 60% renewables target?

Greek law requires new data centres to cover at least 60% of their annual electricity consumption with power from qualifying new renewable plants. Check how much a project could supply and which dates determine whether it counts.

See how many MWh you still need

Law 5356/2026 · In force since 17 November 2026

Annual supply calculator

Choose where to start for one facility or development phase. You can start before a buyer or renewable plant has been identified.

Which best describes you?

Own a solar PV plant? Estimate what you could offer a data centre and check which conditions your plant meets.

Project inputs

MWh

Include cooling and auxiliary equipment.

MWh

If you have no candidate plant yet, leave this blank to see the full procurement target.

Which evidence to check

Fictional example · scenario inputs

Annual supply estimate

Annual demand
87,600 MWh
60% target
52,560 MWh
Potentially available energy
50,000 MWh
Gap if potential supply is confirmed
2,560 MWh
Allocation you report as documented
50,000 MWh
Coverage from the documented allocation
57.1%
Still to procure on the documented basis
2,560 MWh

For a new connection offer, check the offer date and the deadline for the physical-delivery PPA and technical report.

The estimate assumes the stated volume meets the plant, timing and allocation conditions.

Volumes and evidence status are supplied by you. This planning estimate uses annual volumes. The operator checks metered generation and consumption under the applicable methodology.

Open printable summary

The summary includes the stage, volumes, assumptions and date. Use the print dialog to save a PDF.

Open a PV8 workspace

Law 5356/2026

Which projects count

At the data centre application

The renewable plant must still lack its operating licence or, for a licence-exempt plant, its energisation certificate. Check the dated record against the data centre’s own connection application.

At contract submission

The renewable plant must hold a final connection offer when the bilateral agreements are submitted. The capacity allocated to the centre cannot receive operating aid. Check whether those MWh are already committed elsewhere.

By data centre energisation

The associated generators and storage must be operating by the time the data centre is energised. A delay suspends energisation of the centre.

Supply routes and connection filings

Article 27 permits direct connection, physical-delivery PPAs and financially settled PPAs accompanied by guarantees of origin from projects in the interconnected system. Under Article 27(4), renewable electricity used by the centre for self-consumption with synchronised netting may also count to the extent it matches the centre’s consumption. Article 22 requires new connection-offer holders to submit a physical-delivery PPA and a technical report within 12 months of the offer and before signing the connection agreement.

What still needs a decision

As of 21 November 2026, PV8 could not verify publication of the ministerial decision on time matching, verification or potential reductions for certain technologies or storage. This calculator uses the 60% baseline.

Read the legislation

Reviewed 21 November 2026

Discuss your project with PV8

For a data centre, describe the phase and what you know about the grid connection and load. For a renewable plant, tell us its development stage and available output.

Our team can help identify the evidence you still need before speaking to a buyer or supplier. A short description is enough, and project names are optional.

You can also email pv8@pv8.ai.

PV8 receives the name, email and message you enter here. Privacy.