PV8.ai Engineering Handoff | Direct wire
Package: d90551379068f87cb54f932bbc3fdfb0e67d721cdeaf07b30ea00812c183a53f
Status: CONCEPT_WITH_VERIFICATION_FLAGS

CONCEPT DESIGN - NOT FOR CONSTRUCTION. Functional single-line blocks; no protection coordination, fault-duty, earthing, cable sizing or utility approval is implied.

Actual format availability for this package:
- Concept electrical SLD: INCLUDED — electrical/concept-sld.dxf
- Site DXF / GIS geometry: NOT_INCLUDED — No frozen site geometry; engineering layout and route survey required
- PVsyst project and variants: NOT_INCLUDED — No PVsyst project/variant is included for this saved source. Review the information-required schedule.
- CIM16 network exchange: NOT_INCLUDED — Owner network parameters were not supplied. See electrical/cim-readiness.json before requesting network exchange.
- PowerFactory study request and runner: NOT_INCLUDED — No explicit electrical study request was supplied. A licensed PowerFactory project and reconciled object mapping are required.
- Native DWG: NOT_INCLUDED — Native DWG is not generated. Open the included DXF in a compatible CAD application and validate before conversion.
- Native PVcase design: NOT_INCLUDED — Native PVcase objects are not generated. Included site geometry is reference geometry requiring engineering conversion.
File presence is not native software acceptance, engineering approval or a certified design.

CAD: open electrical/concept-sld.dxf in AutoCAD. Each sheet is 320 mm apart in model space. Schematic millimetres; no geographic coordinates. Equipment blocks carry graphical symbols drawn after IEC 60617 (PV array, inverter, transformer, circuit breaker, disconnector, meter, busbar; the legend on the last sheet and in concept-sld-legend.svg also shows earthing, which no block asserts) on layer PV8_EQUIPMENT with their marks; feeders on PV8_FEEDERS, labels on PV8_LABELS. It remains a CONCEPT single-line diagram, not a certified drawing: symbols do not select or rate protection.
Schedules: UTF-8 CSV; blank means unknown, never zero. Equipment IDs and feeder endpoints reconcile to electrical-model.json. Operating kW/kVA/current requirements are not nameplate ratings, breaker settings or cable ampacities. The BOP assembly schedule links frozen catalogue identities to topology roles and leaves procurement ratings open.
Pre-fill: inputs with status ASSET_RECORD were read from the asset record (connection voltage, PCC reference, DSO, DC/AC capacity, export limit, coordinates); evidence-register.csv names each field. Confirm them against the connection agreement and as-built documents.
Groups: power is equally divided across entered groups; feeder allocation needs engineering review. Data-center 2N paths each carry full duty, not double economic demand; independence and transfer are unverified.
Source: frozen-output.json is a lossless JSON reserialization, whose own checksum appears in manifest.json. source_sha256 identifies the original stored bytes. The frozen decision brief and economics remain on that source basis; handoff inputs do not rerun financial or electrical engines. A changed topology may invalidate the original economics.
Document control: archive this ZIP, edit a copy, and return revised DXF and schedules with this package ID. No files are sent to third parties; asset-record values enter only as labelled ASSET_RECORD inputs.

No frozen site geometry; engineering layout and route survey required
Datasheets: no PAN/OND or equipment datasheet is stored for this asset in your scope.
Yield and losses: the saved output holds no yield model; no report was generated.
String table, stringing diagrams, BoM, PVsyst files and the O&M scope are produced for the PV-plant engines (repowering, grid value, land, agrivoltaics); this engine's package carries none.