Illustrative example · synthetic plant and assumptions
PV8

Direct-wire supply

PV8 demonstration solar plant, HR · 4 MWp · synthetic inputs

Needs confirmation

A mapped industrial lead is not an offtaker. Confirm interval load, commercial interest, route and supply rules.

Illustrative nearby leads
1 sites
Qualified buyers
0 sites
Indicative route length
1.8 km
Why

BUYER NOT YET QUALIFIED

Compare the scenario with its baseline

Mapped industrial leads
1 sites
Qualified buyers
0 sites
Assumptions and limits

This example does not establish a complete annual investment model. Required inputs remain visible in your workspace.

A nearby site is a lead, not a buyer. Confirm its interval load, route rights, metering and supply regime.

Illustrative inputs

  • Synthetic 4 MWp plant: 16,000 modules × 250 Wp.
  • 4,400 MWh/year generation and 8 ha site area are illustrative inputs.
  • No grid import agreement, customer contract or surveyed layout is supplied.

Three next steps

  • Obtain the buyer’s timestamped load data and commercial interest.
  • Survey the route and establish wayleaves and connection requirements.
  • Check jurisdiction-specific supply and metering rules.
CONCEPT PACKAGE · ENGINEER VERIFICATION REQUIRED

Engineering handoff package

The sample package contains a functional concept SLD built from explicit synthetic assumptions. It is editable and traceable, but it is not for construction and does not invent protection, cable, earthing or utility approvals.

  • Concept single-line diagram · PDF, SVG and editable DXF
  • Equipment, feeder, evidence and information-required schedules · XLSX and CSV
  • Design basis, saved decision brief and exact result snapshot · PDF and JSON
  • Checksummed manifest and package lineage · JSON
Download sample engineering package · ZIP
01SLD + CAD
02Schedules
03Lineage
Built for review and continuation in the customer’s engineering workflow.

Use this example to see the decision process. Your own result depends on your plant, assumptions and evidence; it is not a financing approval.

Explore this route in PV8

Buyer discovery

Identify and qualify nearby industrial users.

Load matching

Use interval evidence to test coincident PV supply.

Two-sided economics

Compare the seller’s value with the buyer’s delivered price.

Calculation basis

Generated offline with PV8 engine code. No customer information or live provider response is included. Financial figures use EUR. Rebuild recipe: scripts/build_public_sample_snapshots.py.

Snapshot SHA-256: 8da17b1128cdba488f2330e70b3c2be904c683f9c1b434794e1a31d4e5002217

{
  "schema": "pv8.public_samples/1",
  "slug": "direct_wire",
  "country": "HR",
  "currency": "EUR",
  "sha256": "8da17b1128cdba488f2330e70b3c2be904c683f9c1b434794e1a31d4e5002217",
  "recipe_sha256": "6336621d4d7dd98e4d258b757e006f2dad71c51d6d5a7fda73afb56d034eef41",
  "engine_revision": "c5aa99ad8082b8a4f9763ae23f8b0816f66537ad"
}

Download the complete calculation JSON