Connection opportunity comparison
Battery has the highest entered-scenario NPV among feasible candidates.
Candidates within entered constraints2of 3
Highest feasible scenario NPV€105,395.7EUR
Solar€27,884.9 EUR NPV
Fits stated capacity and budgetBattery€105,395.7 EUR NPV
Fits stated capacity and budgetCharging · outside limits€75,021.6 EUR NPV
Exceeds import limitBefore you progress
- Establish connection rights, remaining capacity and transfer restrictions.
- Validate each candidate with site studies; do not add these mutually exclusive cash flows together.
Assumptions & limits
- Comparison of mutually exclusive, user-entered projects; not a valuation of connection rights or automatic site development.
- Inputs are unverified. EUR only; no automatic currency conversion or jurisdiction-specific entitlement is inferred.
- Annual cash and capacity requirements are supplied by the user, not generated by a site study. Candidates are mutually exclusive. No combined dispatch, land availability, connection approval or transferable rights valuation is inferred.
Inputs used in this assessment
| Available import capacity | 250.0 kW |
|---|---|
| Available export capacity | 500.0 kW |
| Investment budget | 400000.0 EUR |
| Solar: investment | 300000.0 EUR |
| Solar: annual net operating cash | 36000.0 EUR/year |
| Solar: import requirement | 0.0 kW |
| Solar: export requirement | 400.0 kW |
| Battery: investment | 350000.0 EUR |
| Battery: annual net operating cash | 50000.0 EUR/year |
| Battery: import requirement | 200.0 kW |
| Battery: export requirement | 200.0 kW |
| Charging: investment | 180000.0 EUR |
| Charging: annual net operating cash | 28000.0 EUR/year |
| Charging: import requirement | 300.0 kW |
| Charging: export requirement | 0.0 kW |
| Assessment term | 15.0 years |
| Discount rate | 7.0 % |
Visitor-entered scenario assumptions · PV8 bounded scenario screening · PV8 shared finance core
Model: partner-scenarios-v2 · Reference: 9c0c70136741